| Project Number | 331 |
| Date of Summary | March 01, 2003 |
| Subject | Lifetime Cost of Sub-sea Production Systems (JIP) |
| Performing Activity | DNV/Goldsmith Consulting |
| Principal Investigator | Riley Goldsmith, Remi Ericson (DNV) |
| Contracting Agency | Minerals Management Service |
| Completion | October 2000 |
| Description | The objective of this JIP was to develop and demonstrate a structured probabilistic procedure for assessing the lifetime risk and reliability of sub-sea production systems. System costs will be evaluated with respect to safety, environmental, and operational matters (OPEX, CAPEX, RISKEX, etc.). |
| Progress | The first meeting of the JIP participants was held on October 6, 1999. Work on a report and spreadsheet program proceeded until the final scheduled meeting on September 26, 2000. At that meeting, a draft final report and a draft spreadsheet were presented for review. The project was completed in 2000 as a final report and spreadsheet software were delivered to JIP participants at the conclusion of the project. |
| AA |
Lifetime Cost of Subsea Production Systems, prepared for Subsea JIP, System Description & FMEA Rev. 2, Det Norske Veritas, June 2000. |
|
AB
|
Lifetime Cost of Subsea Production Systems, prepared for Subsea JIP, Final Report Rev. 0, Det Norske Veritas, November 2000. |
|