|
Deepwater Research Projects |
|
008 |
Blowout Prevention Procedures for Deepwater
Drilling |
|
029 |
Deepwater Structures Technology Assessment |
|
036 |
Strumming of Risers |
|
076 |
Damage Mechanisms in the Placement and Repair of
Pipelines |
|
081 |
Fatigue of Selected High Strength Steels in Sea
Water |
|
084 |
Surface Oil Spill Containment and Cleanup |
|
085 |
Subsea Collection of Blowing Oil and Gas |
|
091 |
Underwater Subsea Production System Inspection |
|
094 |
Dynamic Motion Study of a Large Scale Compliant
Platform |
|
111 |
Development of a Method to Evaluate the Tension
Capacity of Drilled and Grouted Piles |
|
115 |
Hydrodynamic Effects on Design of Offshore
Platforms |
|
133 |
Synthetic-Fiber Mooring Lines for Deepwater
Floating Production Facilities |
|
147 |
Method for Predicting Hydrodynamic Damping for
Offshore Structures |
|
150 |
Floating Vessel Blowout Control |
|
165 |
Deepwater Pipeline Maintenance and Repair |
|
186 |
Hydrodynamic Damping and Combined Motion Loading
(HYDAMP II) |
|
189 |
Strengthening Modifications and Repair
Techniques |
|
195 |
Shallow Gas Broaching |
|
212 |
Deep Water Subsea Conceptual Studies, Phase I. |
|
216 |
SPAR Development Model Test Program |
|
226 |
Hydrates of Hydrocarbons--Practical Implications |
|
257 |
Strategy-Inhibition of Shallow Water Flows |
|
266 |
Support of the Offshore Technology Research
Center |
|
275 |
Riser Reliability Analysis |
|
280 |
Risk Assessment for Dry Tree Tieback
Alternatives Study |
|
284 |
Investigation of Hybrid Deep Water Production
Systems |
|
287 |
Fate and Behavior of Deepwater Subsea Oil Well
Blowouts in the Gulf of Mexico |
|
305 |
Highly Compliant Rigid-Pipe Riser Analysis |
|
311 |
Oil Spill Containment, Remote Sensing, and
Tracking from Deep Water Blowouts: Status of Existing and Emerging |
|
315 |
Engineers Design Guide to Deepwater Fiber
Moorings |
|
316 |
Reliability Study for Synthetic Moorings |
|
317 |
Deep Water Pipeline Repair Methods |
|
319 |
Reliability of Subsea Blowout Preventer Systems
for Deepwater applications--Phase II |
|
324 |
Experimental and Analytical Study of Multi-phase
Plumes in a Stratified Ocean with Application to Deep Ocean Spills |
|
327 |
Applied Gas Hydrate Research program |
|
328 |
OTRC Cooperative Agreement |
|
331 |
Lifetime Cost of Subsea Production Systems |
|
344 |
Durability of Polyester Rope Moorings |
|
359 |
Comparative Risk Analysis of Deep Water
Production Systems |
|
362 |
Suction Caissons & Vertically Loaded Anchors
(Part I and Part II) |
|
369 |
Polyester Rope Analysis Tool |
|
372 |
State of the Art of Removing Large Platforms Located in Deep Water |
|
377 |
Deep Spill |
|
380 |
Evaluation of the Suitability of Industry
Standards as MMS Requirements |
|
382 |
Experimental Validation of Well Control
Procedures in Deepwater |
|
383 |
Performance of Deepwater BOP Equipment During
Well Control Events |
|
384 |
Deepwater Riser Wear Technology |
|
386 |
Deepwater Dual-Density Drilling Workshop |
|
389 |
Characterizing Polyester Rope Installation Damage |
|
394 |
Interim Damage Criteria for Replacing Damaged Polyester Rope |
|
397 |
Severe Slugging Elimination in Ultra-Deep Water
Tiebacks and Risers |
|
398 |
Reliability of Pressure Signals in Offshore Pipelines Leak Detection |
|
402 |
Workshop on FPSO |
|
404 |
Project Offshore Deep slopes (PODS):
Seafloor Stability on the continental Shelf/Slope |
|
407 |
Damage Tolerance of Synthetic-Fiber Mooring
Ropes; Phase I: Small-Scale Experiments |
|
408 |
Development of a Blowout Intervention Method
and dynamic Kill Simulated for Blowouts Occurring Ultra-Deepwater |
|
409 |
Worldwide Assessment of Industry Leak
Detection Capabilities for Single and Multiphase Pipelines |
|
410 |
Deepwater Geohazards Workshop |
|
416 |
Damaged Polyester Rope-Large Scale
Experiment |
|
417 |
Deepwater Field Measurements |
|
418 |
Risk-Extend CRA for a SPAR-Based FPSO |
|
421 |
Seafloor Slope Stability Assessment |
|
423 |
Reliability of Mooring Systems for
Floating Production Systems |
|
426 |
Long Term Integrity of Deep-Water Cement
Systems |
|
432 |
Regional Synthesis of the Sedimentary
Thermal History and Hydrocarbon Maturation in the Deepwater Gulf of
Mexico |
|
434 |
Strain-Based Design of Pipelines |
|
435 |
Hydrate Flow Performance |
|
437 |
Reliability Analysis of Deepwater Anchors |
|
443 |
Technology
Assessment of Alternatives for Handling Associated Gas Produced from
Deepwater Oil Developments in the GOM |
|
446 |
ROV/AUV
Capabilities |
|
461 |
Characterizing Natural Gas Hydrates in the
Deepwater Gulf of Mexico |
|
471 |
Assessment of Performance of Deepwater
Floating Production Facilities |
|
472 |
Project Offshore Deep Slopes (PODS) - Phase
II |
|
475 |
Workshop on Deepwater Drilling: Where are we
headed? by International Association of Drilling Contractors |
|
479 |
Deep-Sea Furrows |
|
480 |
An Assessment of Safety, Risks and Costs Associated with Subsea
Pipeline Removals |
|
481 |
Deepwater Riser VIV Project - CFD Simulation of Riser VIV |
|
482 |
VIM/SPAR Industry Forum |
|
483 |
CFD Simulation of Ocean Turbulence Interactions with Spar Platforms |
|
487 |
An Assessment of Magnetization Effects on
Hydrogen Cracking for Thick Walled Pipelines |
|
490 |
CRA for Composite Drilling and Production Risers |
|
491 |
Risk Assessment for Submarine Slope
Stability |
|
492 |
Reliability of Subsea Systems |
|
494 |
New Touch-Down Zone Solutions for Steel
Catenary Risers (SCRs) |
|
496 |
Design of Cathodic Protection Systems for
Deep Water Compliant Petroleum Production Risers |
|
497 |
Probabilistic Reliability and Integrity
Assessment of Large-Diameter Compliant Risers for Ultra-Deepwater
Operations |
|
499 |
Development of Recommended Practices for Allocation Measurement |
|
500 |
Risk Comparison of Subsea versus Surface Processing |
|
502 |
Assessment of New and / or Improved Repair
Techniques for Ageing or Damaged Structures |
|
509 |
Interstitially Insulated
Pipe |
|
510 |
Seafloor Interaction
with Steel Catenary Risers |
|
519 |
Drilling and Completion Gaps for High Temperature and High Pressure In
Deep Water |
|
521 |
Riser VIV Workshop |
|
522 |
Methodologies for Measuring and Monitoring Hydrogen for Safety in
Advanced High Strength Linepipe Steel Applications. |
|
525 |
IADC workshop on “Offshore Logistics” Conference |
|
530 |
SCR Flex Joint Design and
Performance JIP |
|
531 |
SCR Integrity Management JIP |
|
532 |
Deepwater GOM Pipeline Damage Characteristics and Repair Options |
|
536 |
Vertical Access Riser Comparative Risk Assessment |
|
540 |
Risk Assessment of Surface vs. Subsurface BOP's on Mobile
Offshore Drilling Units |
|
541 |
Application of Dual
Gradient Technology to Top Hole Drilling |
|
556 |
Risk Assessment of Submarine Slope Stability - Hydroplaning |
|
557 |
Numerical Modeling of Torpedo Anchors |
|
560 |
Performance of Deepwater Production Platforms |
|
582 |
A Probabilistic Approach
to Risk Assessment of Managed Pressure Drilling in Offshore Drilling
Applications |
|
583 |
Characterizing Material
Performance for Design of Sour Service HPHT Equipment in Accordance
with API RP 6HP Practices |
|
591 |
Evaluate Accuracy of
Polyester Subrope Damage Detection Performed by ROVs Following
Hurricanes and Other Events |
|
592 |
Connector Designs for Top and Bottom
Tendon Connections |
|
599 |
Joint Industry Project
to Quantify Risks in Deepwater Production Facilities and Flowlines
in the GOM |
|
602 |
Cement Fatigue and HPHT
Well Integrity with Application to Life of Well Prediction |
|
603 |
Stability of Tension Leg Platforms with Damaged
Tendons |
|
604 |
Evaluation of Fatigue Life Models and Assessment
Practice for Tension Leg Platforms (Phase 1: Tendon System Fatigue) |
|
605 |
Cooperative Research on Extreme Seas and
their Impact to Floating Structures |
|
610 |
Marco Polo JIP Extension
2008 - 2009 Full-Scale Monitoring Marco Polo TLP |
|
614 |
ISO 13628-12 / API RP
2RD Dynamic Risers for Floating Production Installations JIP |