|
|||||||||||||
|
Content: Pagemasters:
|
Pacific
Region Pipeline Events 1999 June 5, 1999 - Aera Energy LCC
Remarks: The 12" bulk production line from Platform Eureka to Platform Ellen/Elly developed a leak and was shut-in. The leak was verified by a pressure test the next day. An ROV was used to locate the leak and determine a course of remedial action. After consulting the U.S. Coast Guard on August 18, the preliminary spill volume was revised to 10 bbls. Privacy | Disclaimers | Accessibility | Topic Index | FOIA Last Updated: 06/24/08, 03:07 PM |