MMS United States Department of the Interior
OCS-Related Incidents -- Offshore Energy and Minerals Management

Offshore Minerals Management home page
Safety-Related Information
Offshore Stats and Facts
OCS-Related Incidents
spacer
Abbreviations and Acronyms
Collisions
Crane Incidents
Fatalities
Fires/Explosion
Incident Reporting
Incident Statistics Summaries
Incidents 1996-2005
Injuries
Loss of Well Control
Other Incidents
Pipeline Incident
Spills 1996-2008
Spills 1994-1995
spacer
Privacy Act/Disclaimers
Minerals Commodities Revenue Statistics
spacer

 Content:
    Melinda Mayes

 Pagemasters:
    OMM Web Team

spacer

  Pacific Region

Other – 2005

06-Jan-2005 – Plains Exploration & Production Company (PXP)

MMS Investigation Report:

Completed

Activity:

Development/Production

Lease:

P00450

Event(s):

Other – H2S gas release

Area:

Santa Maria

Operation:

Production

Block:

464

Cause:

Equipment Failure

Rig/Platform:

/ HIDALGO

Water Depth:

430 feet

Remarks:  There was a gas release due to a rupture of a Ύ -inch diameter piece of pipe attached to the glycol vessel located on Platform Hidalgo’s Production Deck. The glycol vessel was operating at normal pressure of approximately 1285 psi with normal H2S concentrations of approximately 19,500 ppm. The release was initially detected by a combustible gas detector which triggered an alarm and a simultaneous emergency shut down (ESD).


09-May-2005 – Plains Exploration & Production Company (PXP)

MMS Investigation Report:

None

Activity:

Development/Production

Lease:

P00450

Event(s):

Other – H2S gas release

Area:

Santa Maria

Operation:

Production

Block:

464

Cause:

Equipment Failure

Rig/Platform:

/ HIDALGO

Water Depth:

430 feet

Remarks:  There was a gas release due to a pinhole leak in an idle 3-inch line formerly used to route the condensate.  This line had not been used for approximately 6 years since an alternate route for the condensate was installed.


06-Jun-2005 – Arguello Inc.

MMS Investigation Report:

None

Activity:

Development/Production

Lease:

P00450

Event(s):

Crane Incident

Area:

Santa Maria

Operation:

Production

Block:

464

Cause:

Equipment Failure

Rig/Platform:

/ HIDALGO

Water Depth:

430 feet

Remarks:  While raising the 13-5/8-inch drilling riser and positioning it to be placed in the “V” door the two nylon slings broke.  The riser fell and struck the northwest corner of the rig and pipe deck.


17-Jun-2005 – Plains Exploration & Production Company (PXP)

MMS Investigation Report:

None

Activity:

Development/Production

Lease:

P00450

Event(s):

Other – H2S gas release

Area:

Santa Maria

Operation:

Production

Block:

464

Cause:

Equipment Failure

Rig/Platform:

/ HIDALGO

Water Depth:

430 feet

Remarks:  There was a gas release occurred from the lower man way.  Improper series flexitaulic gaskets were installed on both tope and bottom of man ways.  Only a small portion of the flexitaulic material was actually making a seal.